Transition Studio (COUGAR focus) — 2026

Round 4activeCitiesOAK/HWF

When to use this file:

  • When asking what the Transition Studio position is and what it delivers in 2026
  • When understanding the COUGAR / Porto Alegre delivery scope
  • Cross-reference ws4-cross-cutting-learning.md for the bioregion learning workstream
  • Cross-reference cougar for the community delivery side (Pyxera-led)

Transition Studio (COUGAR focus) — 2026

Overview

The Transition Studio in 2026 provides the data infrastructure, digital tools, and portfolio-design methodologies to build city-, region-, and community-aligned project pipelines that are genuinely finance-ready. It creates the missing middle layer between data/plans and capital deployment — a replicable model for Place-Based Transition Funds.

Budget split: ~80% COUGAR delivery in Porto Alegre / Rio Grande do Sul · ~20% cross-cutting learning and Transition Fund Studio requirements (Workstream 4).

Associated Portfolio Positions

PositionRole
COUGAR Y1Analytical foundations: risk assessments, stakeholder mapping, portfolio framing
COUGAR QCF Community InvestmentUSD 50K recoverable grant pool for community-led NbS project design
COUGAR Y2 (Pyxera)Community engagement, project co-development — critical dependency for WS3
Transatlantic BioregionsHorizontal learning partner for WS4
Other SCAC place-based / finance positionsPortfolio-level learning on investment logic, risk-sharing, governance

Key Systemic Strategy

Addresses a recurring failure across the Collaborative’s portfolio: the inability of places to translate community-aligned transition intent into investable, well-governed projects that can absorb capital at speed and scale.

Contributes by:

  • Enabling community ownership within post-disaster and transition finance
  • Creating project preparation systems and portfolio logic (the “missing middle”)
  • Demonstrating a replicable Place-Based Transition Fund model
  • Generating cross-territorial learning between urban (Porto Alegre) and bioregional contexts (Transatlantic Bioregions, Rio Grande do Sul watershed)

Workstreams

WS1 — Data Infrastructure for NbS Project Design and Prioritisation

Lead: Open Earth Foundation

Extends geospatial risk assessment from 2025. Hazard/vulnerability layers (flooding, heat, landslides), NbS suitability outputs for priority neighbourhoods, interoperability with Regenera RS Adaptation Observatory and municipal PLAC. Scope limited to Porto Alegre; statewide scaling deferred.

WS2 — Community-Anchored NbS Project Development

Lead: Pyxera (COUGAR Y2) — critical dependency

Deep community engagement and co-development of NbS projects with local actors. Collaboration with Associação Vila Flores as primary community partner. USD 50K QCF recoverable grant deployed for technical feasibility and detailed design of priority NbS project.

WS3 — Project Preparation Infrastructure and Financial Readiness

Co-leads: Open Earth Foundation + Bankers without Boundaries (EUR 30K)

OEF: project preparation workflows, templates, and digital tooling for urban NbS, aligned with CityCatalyst methodology. BwB: bankability and financial readiness analysis for pipeline of 5–8 NbS projects. Output: Bankability Assessment Report with prioritised shortlist and financing pathways.

WS4 — Cross-Cutting Learning and Transition Studio Requirements Definition

Co-lead: Open Earth Foundation, in collaboration with SCAC partners

See workstreams/ws4-cross-cutting-learning.md for full detail.

Cross-cutting collaboration with Transatlantic Bioregions and other place-based SCAC positions. Does not deliver the TFS digital platform — delivers a well-grounded, practitioner-informed set of requirements and design principles for a future build.

Budget Allocation

OrganisationAllocationRole
Open Earth FoundationUSD 100,000Data infrastructure, project prep tooling, portfolio logic, community investment deployment, TFS coordination
Bankers without BoundariesEUR 30,000Bankability assessment, financial readiness, project prioritisation, fund design
COUGAR QCF Community Investment PoolUSD 50,000 (separate, embedded in COUGAR Y1)Recoverable grant for community-led NbS project technical design

Non-Collaborative Partners

PartnerRole
Associação Vila FloresPrimary community partner; leads flagship NbS project technical design
City of Porto AlegreInstitutional partner; alignment with PLAC and municipal planning
Porto Alegre Ministry of InnovationProject acceleration mechanisms, digital tool integration
Regenera RS / Coalizão RSEcosystem coordination, philanthropic + private capital links
Bridging Ventures / The Journey FundCross-territorial learning; Journey Fund (Colombia) experience
Google Earth / City Product teamsGeospatial AI for urban canopy, NbS suitability
AuraDigital twin engine for scenario modeling and spatial analysis

Key Milestones

  1. Coordinated governance across Regenera RS, COUGAR (Pyxera), municipal partners, community actors
  2. Functional NbS data and project preparation framework + digital tool
  3. ≥1 community-led NbS project advanced through detailed technical design (recoverable grant)
  4. Financial readiness and bankability assessments for prioritised NbS pipeline
  5. Initial NbS portfolio consolidated, aligned with transition and reconstruction priorities
  6. Validated requirements set + roadmap for scaling TFS platform beyond Porto Alegre

Future Funding Roadmap

2026 is the final direct SCAC contribution to COUGAR Porto Alegre. Future funding targets:

  • NbS pipeline expansion across Rio Grande do Sul (development banks, public reconstruction funds)
  • Revolving project preparation mechanism (building on QCF recoverable grant model)
  • Full development of TFS integrated digital platform (requirements defined in WS4)

Known Gaps

  • WS4 bioregion learning tour scheduling with Transatlantic Bioregion partners — pending confirmation
  • TFS platform requirements document not yet produced (WS4 output)
  • Detailed COUGAR Y2 project list and community engagement timeline (Pyxera-led, not yet in KB)
Page: positions/transition-studio/overview.md · last updated 2026-04-24 · check by 2026-07-09 · source: _sources/drive/2026-04-transition-studio-workplan.md· suggest a correction